Télécharger Imprimer la page

GreenWorks PS82210 Manuel D'opérateur page 8

Élagueuse sur perche

Publicité

Les langues disponibles

Les langues disponibles

EN
8.
The whole oil tank will last for approximately 20-
40 minutes.
Do not use dirty, used or contaminated oil. Damage
can occur to the bar or chain.
7.3
ASSEMBLE THE GUIDE BAR AND THE
CHAIN
1.
Switch off the machine and remove the battery.
2.
Loosen the chain cover by turning the chain cover
knob (8) counterclockwise.
3.
Remove the chain cover (14).
4.
Put the chain drive links (17) into the bar groove
(15).
5.
Put the chain cutters (16) in the direction of the
chain operation.
6.
Ensure the chain is put on in the correct direction
(do not assemble with the cutters backwards).
7.
Put the chain in position and make sure that the
loop is behind the guide bar.
8.
Hold the chain and bar.
IMPORTANT
English
9.
Put the chain loop around the sprocket (18).
10. Make sure the chain tension pin hole (19) on the
guide bar fits correctly with the bolt.
11. Install the chain cover.
12. Tighten the chain. Refer to Adjust the chain
tension.
13. Tighten the bar nut when the chain is correctly
tensioned.
If you start the chain saw with a new chain, have a
test for 2-3 minutes. A new chain gets longer after
the first use, examine the tension and tighten the
chain if necessary.
7.4
FIT THE POLE SAW
1.
Mount the pole saw head on pole saw handle to
achieve the standard length.
2.
Slide the collar upwards.
3.
Turn the collar clockwise to tight it.
7.5
EXTENSION OF THE POLE SAW
8
NOTE

Publicité

loading