MONTAGE- UND BETRIEBSVORSCHRIFT
INSTALLATION AND OPERATING INSTRUCTIONS
NOTICE DE MONTAGE ET D'UTILISATION
Wand-Einbaugerät
Wall installed unit
Groupe double-flux mural
KWL EC 60 Pro
KWL EC 60 Pro FF
- Wärmerückgewinnung und EC-Technik
für Einzelräume.
- Heat recovery and EC-motor technology
for single rooms
- Ventilation décentralisée avec récupération
de chaleur et moteurs EC.
D
NR. 86666
UK
NO. 86666
N° 86666
F

Publicité

Table des Matières
loading

Sommaire des Matières pour Helios EcoVent KWL EC 60 PRO

  • Page 1 Helios Ventilatoren MONTAGE- UND BETRIEBSVORSCHRIFT NR. 86666 INSTALLATION AND OPERATING INSTRUCTIONS NO. 86666 NOTICE DE MONTAGE ET D’UTILISATION N° 86666 Wand-Einbaugerät Wall installed unit Groupe double-flux mural KWL EC 60 Pro KWL EC 60 Pro FF - Wärmerückgewinnung und EC-Technik für Einzelräume.
  • Page 2: Table Des Matières

    DEUTSCH Helios Ventilatoren MONTAGE- UND BETRIEBSVORSCHRIFT NR. 86666 Inhaltsverzeichnis KAPITEL 1. ALLGEMEINE MONTAGE- UND BETRIEBSHINWEISE ........Seite 1 Wichtige Informationen .
  • Page 3: Wichtige Informationen

    Wenn die nachfolgenden Ausführungen nicht beachtet werden, entfällt unsere Gewährleistung. Gleiches gilt für Haf- tungsansprüche an den Hersteller. Der Gebrauch von Zubehörteilen, die nicht von Helios empfohlen oder angeboten werden, ist nicht statthaft. Even tuell auftretende Schäden unterliegen nicht der Gewährleistung.
  • Page 4: 1.10 Elektrischer Anschluss

    Montage- und Betriebsvorschrift Wand-Einbaugerät KWL EC 60 Pro / ... Pro FF 1.10 Elektrischer Anschluss WARNUNG Vor allen Wartungs- und Installationsarbeiten oder vor Öffnen des Schaltraumes ist das Gerät allpolig vom Netz zu trennen! Der elektrische Anschluss darf nur von einer autorisierten Elektrofachkraft entsprechend den nachstehenden Anschlussplänen ausgeführt werden.
  • Page 5: Wandmontage Kwl 60 Rs Rohbauset

    Montage- und Betriebsvorschrift Wand-Einbaugerät KWL EC 60 Pro / ... Pro FF Wandmontage KWL 60 RS Rohbauset KAPITEL 3 Kernbohrung in der Wand vornehmen (siehe Abb. 5). Anschl. Wandhülse in die Wand einschieben und einputzen. Um beim Einputzen eine Verformung der Wandhülse zu vermeiden, muss das Versteifungskreuz aus Styro- MONTAGE/AUFSTELLUNG por (siehe Abb.
  • Page 6: Montage Kwl 60 Dr Distanzrahmen

    Montage- und Betriebsvorschrift Wand-Einbaugerät KWL EC 60 Pro / ... Pro FF Montage KWL 60 DR Distanzrahmen Abb.10 SS-932 Funktionsbeschreibung zum Menübaum des Bedienelementes KWL-BC.. KAPITEL 4 A1 = Erstinbetriebnahme: Steigt die CO -Konzentration über Beginn des Urlaubs automatisch und BEDIENELEMENT Bei Erstinbetriebnahme erfolgen fol- 1600 ppm oder der Feuchtewert...
  • Page 7 Montage- und Betriebsvorschrift Wand-Einbaugerät KWL EC 60 Pro / ... Pro FF D7 = Filterwechsel: E9 = Adresse Bedienelement: Das Filterwechselintervall kann zwi- Die Adresse des Bedienelements schen 2 bis 9 Monaten eingestellt kann nachträglich geändert werden. werden. Über eine Abfrage, kann die Dabei ist zu beachten, dass die Restlaufzeit für den Filterwechsel an- Adressen immer nur einmal vergeben...
  • Page 8: Bedienelement Kwl 60 Bc

    Montage- und Betriebsvorschrift Wand-Einbaugerät KWL EC 60 Pro / ... Pro FF Bedienelement KWL-BC.. Das KWL-Wand-Einbaugerät wird mit einem Bedienelement KWL-BCU/BCA (für Unterputz oder Aufputzmontage) angesteuert. Es ermöglicht einen manuellen/automatischen 4-stufigen Betrieb. Dem Bedienelement liegt eine Steuer- leitung (3 m) mit beidseitigem RJ 12 Stecker zur einfachen Montage bei. Ein Anschluss von bis zu 4 Bedienelementen ist möglich.
  • Page 9 Montage- und Betriebsvorschrift Wand-Einbaugerät KWL EC 60 Pro / ... Pro FF C4.1.3 Montag (C4.1.3) C4.1.4 Montag (C4.1.4) C4.1.5 Montag (C4.1.5) C4.1.6 Montag (C4.1.6) C4.1.7 Montag kopieren (C4.1.7) C4.1.8 Montag kopieren (C4.1.8) C5.1 Urlaubsprogramm (C5) Urlaubsprogramm (C5.1) EIN/AUS Werkseinstellung AUS NOTIZEN: .
  • Page 10 Montage- und Betriebsvorschrift Wand-Einbaugerät KWL EC 60 Pro / ... Pro FF C5.5.2 C5.5.1 Intervallzeit (C5.5.2) 1-24 h Werkseinstellung 1h Lüftungsstufe (C5.5.1) Stufe 1 - AB ............. . . NOTIZEN: C5.6 Einschaltzeit (C5.6)
  • Page 11 Montage- und Betriebsvorschrift Wand-Einbaugerät KWL EC 60 Pro / ... Pro FF Schaltstufen (D1.3) D1.3 00 % r.F Werkseinstellung 10 D1.4 Nachlaufzeit (D1.4) 1-4 Stunden Werkseinstellung 2 -Sollwerte (D2) D2.1 Status CO -Steuerung (D2.1) EIN/AUS Werkseinstellung AUS KWL EC 60 Pro und KWL EC 60 Pro FF) NOTIZEN: .
  • Page 12 Montage- und Betriebsvorschrift Wand-Einbaugerät KWL EC 60 Pro / ... Pro FF D6.1 Zu- Abluftstufe (D6) Lüfterstufe Zuluft (D6.1) Stufe 1-4 Werkseinstellung 2 NOTIZEN: ............. . . D6.2 Lüfterstufe Abluft (D6.2) Stufe 1-4...
  • Page 13 Montage- und Betriebsvorschrift Wand-Einbaugerät KWL EC 60 Pro / ... Pro FF D11.1 Wellenbeleuchtung (D11) Einstellung Findelicht (D11.1) 0-100 % Werkseinstellung 50 NOTIZEN: ............. . . D11.2 Einstellung Störungsanzeige (D11.2)
  • Page 14: Fehlermenü/Fehleranzeige Im Display

    Montage- und Betriebsvorschrift Wand-Einbaugerät KWL EC 60 Pro / ... Pro FF Fehlermenü/Fehleranzeige im Display Bei einem Fehler wird die Fehlermeldung angezeigt, Leuchtdauer siehe Displaybeleuchtung. Ist das Display aus, blinkt der Drehencoder rot! E15.1 Luftfilter wechseln (B15) Luftfilter gewechselt (B15.1) JA/NEIN .
  • Page 15: Elektrischer Anschluss

    Montage- und Betriebsvorschrift Wand-Einbaugerät KWL EC 60 Pro / ... Pro FF Elektrischer Anschluss KAPITEL 5 Vor allen Wartungs- und Installationsarbeiten oder vor Öffnen des Schaltraumes ist das Gerät allpolig vom ELEKTROANSCHLUSS Netz zu trennen! Der elektrische Anschluss darf nur von einer autorisierten Elektrofachkraft entsprechend dem nachstehenden Anschlussplan ausgeführt werden.
  • Page 16: Schaltplan Ss-958

    Montage- und Betriebsvorschrift Wand-Einbaugerät KWL EC 60 Pro / ... Pro FF Schaltplan SS-958 für KWL EC 60 Pro / FF Abb.13...
  • Page 17: Kondensatableitung

    Montage- und Betriebsvorschrift Wand-Einbaugerät KWL EC 60 Pro / ... Pro FF Kondensatableitung KAPITEL 6 Während der Heizperiode kondensiert die Feuchtigkeit der Abluft zu Wasser. Beim Baden, beim Saunieren sowie beim Wäschetrocknen oder bei Neubauten, kann sich reichlich Kondenswasser bilden. Das Kondenswasser muss frei aus REINIGUNG UND dem Gerät ablaufen können.
  • Page 18 ENGLISH Helios Ventilatoren INSTALLATION AND OPERATING INSTRUCTIONS NO. 86 666 Contents CHAPTER 1. GENERAL INFORMATION ............page 1 Important information .
  • Page 19: Important Information

    If the preceding instructions are not observed all warranty claims and accommodation treatment are excluded. This also applies to any liability claims extended to the manufacturer. The use of accessories not offered or recommended by Helios is not permitted. Potential damages are not liable for warranty.
  • Page 20: 1.10 Electrical Connection

    Installation and Operating Instructions Wall installed unit KWL EC 60 Pro / ... Pro FF 1.10 Electrical connection WARNING All work must be carried out with the equipment fully isolated from the power supply. The electrical connection are to be carried out in accordance with the relevant wiring diagram and are only to be done by a certified elec- trician.
  • Page 21: Wall Installation Kwl 60 Rs First Fix Set

    Installation and Operating Instructions Wall installed unit KWL EC 60 Pro / ... Pro FF Wall installation of KWL 60 RS first fix set CHAPTER 3 Drill a core hole in the external wall (see fig. 3). Then insert wall sleeve into the wall and plaster it in. In order to avoid a deformation of the wall sleeve, the polystyrene cross support (Fig.1) must be inserted.
  • Page 22: Installation Of Kwl 60 Dr Compensation Ring

    (fastening screws attach partition elements from stainless steel to the extension sleeve not provided by Helios) Functional description to menu tree of comfort controller KWL-BC.. CHAPTER 4 A1 = Initial start-up: If the CO -concentration rises over...
  • Page 23 Installation and Operating Instructions Wall installed unit KWL EC 60 Pro / ... Pro FF D8 = Language: E11 = Software version: Language selection between Ger- Query to the current state of the soft- man, English, French or Italian. ware version of the main board and D9 = Date and time: controller Setting of the current date and time...
  • Page 24: Operating Menu

    Installation and Operating Instructions Wall installed unit KWL EC 60 Pro / ... Pro FF Comfort controller KWL-BC.. The KWL-wall installed unit is controlled by a comfort controller KWL-BCU/BCA (for flush or surface mounted installati It allows a manual or automatic 4-speed operation. A control line (3 m) with RJ 12 plugs on both sides is enclosed along with the comfort controller for easy assembly.
  • Page 25 Installation and Operating Instructions Wall installed unit KWL EC 60 Pro / ... Pro FF C4.1.3 Monday (C4.1.3) Monday Level Time Level Clock Exit C4.1.4 Monday (C4.1.4) Monday Level Time Level Level <Clock> C4.1.5 Monday (C4.1.5) Monday Level Time Level <Level>...
  • Page 26 Installation and Operating Instructions Wall installed unit KWL EC 60 Pro / ... Pro FF C5.5.2 C5.5.1 Interval time (C5.5.2) Interval time Speed step 1-24 h factory setting 1h Speed step (C5.5.1) Level 1 – AB Level 1 - AB Change Next Change...
  • Page 27 Installation and Operating Instructions Wall installed unit KWL EC 60 Pro / ... Pro FF Switching steps (D1.3) D1.3 Switching steps 00 % r.F Factory setting 10 Change Next D1.4 Run on time (D1.4) Run on time 1-4 hours Facrory setting 2 1-4 hours Change Exit...
  • Page 28 Installation and Operating Instructions Wall installed unit KWL EC 60 Pro / ... Pro FF D6.1 Intake/Extract air level (D6) Speed step Speed step intake (D6.1) intake air Level 1-4 Factory setting 2 Level 1-4 Intake/Extract air level Change Next NOTES: .
  • Page 29 Installation and Operating Instructions Wall installed unit KWL EC 60 Pro / ... Pro FF D11.1 Knob light (D11) Setting location light (D11.1) Setting location light 0-100 % Factory setting 50 Knob light NOTES: ..............Change Next D11.2...
  • Page 30: Error Menu/Error Message In The Display

    Installation and Operating Instructions Wall installed unit KWL EC 60 Pro / ... Pro FF Error menu / Error message in display In case of an error the error message is indicated. Burn time see display lighting. If the display is off, the rotory encoder flashes red! E15.1 Change filter (B15) Filter changed?
  • Page 31: Electrical Connection

    Installation and Operating Instructions Wall installed unit KWL EC 60 Pro / ... Pro FF Electrical connection CHAPTER 5 All work must be carried out with the equipment fully isolated from the power supply. The electrical connection ELECTRICAL are to be carried out in accordance with the relevant wiring diagram and are only to be done by a certified elec- CONNECTION trician.
  • Page 32: Wiring Diagram Ss-958

    Installation and Operating Instructions Wall installed unit KWL EC 60 Pro / ... Pro FF Wiring diagram SS-958 for KWL EC 60 Pro / FF fig.13...
  • Page 33: Condensate Removal

    Installation and Operating Instructions Wall installed unit KWL EC 60 Pro / ... Pro FF Condensate removal CHAPTER 6 During the heating period the humidity of the extract air condenses to water. When bathing, while having a sauna as well as when drying the laudry or with new buildings, condensate can richly build up.
  • Page 34 FRANÇAIS Helios Ventilatoren NOTICE DE MONTAGE ET D’UTILISATION N° 86 666 Sommaire CHAPITRE 1. INFORMATIONS GENERALES ........... . .Page 1 Informations importantes .
  • Page 35: Chapitre 1. Informations Generales

    Il en sera de même pour toute implication de responsabilité du fabricant. L’utilisation d’accessoires et d’équipements qui ne sont directement fournis ou conseillés par Helios n’est pas permise. Nous déclinons toute responsabilité en cas de défaut consécutif à leur utilisation.
  • Page 36: 1.10 Raccordement Électrique

    Notice de montage et d’utilisation Groupe double flux mural KWL EC 60 Pro / ... Pro FF 1.10 Raccordement électrique ATTENTION Mettre impérativement l’appareil hors tension avant tous travaux d’entretien ou à l’ouverture du boîtier de commande ! Le branchement électrique doit être réalisé, conformément aux schémas de raccordement ci- dessous, uniquement par un électricien qualifié.
  • Page 37: Chapitre 3. Montage / Disposition

    Notice de montage et d’utilisation Groupe double flux mural KWL EC 60 Pro / ... Pro FF CHAPITRE 3 MONTAGE / DISPOSITION Fig. 5 Distance au mur Insérer et encastrer le manchon mural. min. 350 mm Insérer et encastrer le manchon mural. Respecter une pente de max 0,5 % vers l'extérieur.
  • Page 38: Chapitre 4. Commande A Distance Kwl-Bcu / Kwl-Bca

    Notice de montage et d’utilisation Groupe double flux mural KWL EC 60 Pro / ... Pro FF Montage entretoise pour murs < 350 mm KWL 60 DR Fig.10 Emboîter la virole sur le manchon mural Couper le manchon mural et son renfort au ras de l’entretoise Raccorder l’évacuation des condensats...
  • Page 39 Notice de montage et d’utilisation Groupe double flux mural KWL EC 60 Pro / ... Pro FF D7= Changement des filtres : E11= Version logiciel : L’intervalle de remplacement des Indique la version du programme de filtres est paramétrable de 2 à 9 mois. la platine et de la commande à...
  • Page 40: Arborescence Du Menu

    Notice de montage et d’utilisation Groupe double flux mural KWL EC 60 Pro / ... Pro FF Commande à distance KWL-BC.. Le groupe double KWL flux mural est piloté par une commande à distance KWL-BCU (pour montage encastré / KWL-BCA (pour montage apparent) permettant un fonctionnement à 4 étages en mode manuel ou automatique. Un câble de liaison (3 m) avec un connecteur RJ12 est inclus avec la commande à...
  • Page 41 Notice de montage et d’utilisation Groupe double flux mural KWL EC 60 Pro / ... Pro FF C4.1.3 Lundi (C4.1.3) Lundi Vit. Heure Vit. Heure Sortie C4.1.4 Lundi (C4.1.4) Lundi Vit. Heure Vit. Vitesse <Heure> C4.1.5 Lundi (C4.1.5) Lundi Vit. Heure Vit.
  • Page 42 Notice de montage et d’utilisation Groupe double flux mural KWL EC 60 Pro / ... Pro FF C5.5.2 C5.5.1 Intervalle temps(C5.5.2) Intervalle temps Vitesse 1-24 h Réglage usine 1 h Vitesse ventilation (C5.5.1) 1 - 24 h Vitesse 1 - REP Vitesse 1 - REP Modifier Suivant...
  • Page 43 Notice de montage et d’utilisation Groupe double flux mural KWL EC 60 Pro / ... Pro FF Etages commutation (D1.3) D1.3 00 % HR Etages commutation Réglage usine : 10 Modifier Suivant D1.4 Post-ventilation (D1.4) 1-4 heures Post-ventilation Réglage usine : 2 1- 4 h Modifier Sortie...
  • Page 44 Notice de montage et d’utilisation Groupe double flux mural KWL EC 60 Pro / ... Pro FF C5.5.2 C5.5.1 Intervalle temps(C5.5.2) Intervalle temps Vitesse 1-24 h Réglage usine 1 h Vitesse ventilation (C5.5.1) 1 - 24 h Vitesse 1 - REP Vitesse 1 - REP Modifier Suivant...
  • Page 45 Notice de montage et d’utilisation Groupe double flux mural KWL EC 60 Pro / ... Pro FF Etages commutation (D1.3) D1.3 00 % HR Etages commutation Réglage usine : 50 Modifier Suivant D1.4 Post-ventilation (D1.4) 1-4 heures Post-ventilation Réglage usine : 0 1- 4 h Modifier Sortie...
  • Page 46: Liste Des Messages D'erreur

    Notice de montage et d’utilisation Groupe double flux mural KWL EC 60 Pro / ... Pro FF Liste des messages d’erreur Si un dysfonctionnement survient, un message d’erreur s’affiche. Pour le réglage du témoin défaut voir paragraphe Eclaira- ge écran. Si l’écran de la commande est éteint, la molette clignote en rouge. E15.1 Changer filtre (B15) Me.
  • Page 47: Chapitre 5. Raccordement Electrique

    Notice de montage et d’utilisation Groupe double flux mural KWL EC 60 Pro / ... Pro FF Raccordement électrique CHAPITRE 5 Mettre impérativement l’appareil hors tension avant tous travaux d’entretien ou à l’ouverture du boîtier de commande! Le branchement électrique doit être réalisé, conformément aux schémas de raccordement ci-des- RACCORDEMENT sous, uniquement par un électricien qualifié.
  • Page 48: Schéma De Branchement Ss-958

    Notice de montage et d’utilisation Groupe double flux mural KWL EC 60 Pro / ... Pro FF Schéma de branchement SS-958 pour KWL EC 60 Pro / ... Pro FF Fig.13...
  • Page 49: Chapitre 6. Nettoyage Et Entretien

    Notice de montage et d’utilisation Groupe double flux mural KWL EC 60 Pro / ... Pro FF Evacuation des condensats CHAPITRE 6 Pendant la saison de chauffe, l’humidité de l’air repris peut condenser dans l’échangeur. Lors de bains, douches, saunas, séchage du linge ou dans les constructions neuves, l'eau contenu dans l'air ambiant peut condenser NETTOYAGE ET abondamment.
  • Page 50 KWL EC 60 Pro / ... Pro FF...
  • Page 51 KWL EC 60 Pro / ... Pro FF Notes:...
  • Page 52 HELIOS Ventilatoren GmbH + Co KG · Lupfenstraße 8 · 78056 VS-Schwenningen HELIOS Ventilateurs · Le Carré des Aviateurs · 157 avenue Charles Floquet · 93155 Le Blanc Mesnil Cedex CH HELIOS Ventilatoren AG · Tannstrasse 4 · 8112 Otelfingen GB HELIOS Ventilation Systems Ltd.