Télécharger Imprimer la page

Kohler K-1110 Guide D'installation page 20

Masquer les pouces Voir aussi pour K-1110:

Publicité

Les langues disponibles

Les langues disponibles

Cable to
Ground (Green with
Blower
Yellow Stripe)
Motor
Wire
Brown
Blue
12. Install the Power Cord at the Control - Remote
Install the Junction Box on the Control
Install a second junction box with external bonding lug, two strain reliefs, and a cover (not
supplied) on the blower adapter board on the control.
Connect a solid copper 8 gauge bonding wire from the bonding lug on the new junction box to the
spare bonding lug on the control. Follow all local electrical codes.
Reconnect the Blower Motor Power Cord
If required, reconnect the blower motor power cord at the control.
Route the power cord through a strain relief on the new junction box. Tighten the strain relief.
At the end of the cut power cord, strip back the cable jacket about 3" (7.6 cm).
Cut the unused brown conductor off at the cable jacket.
Strip the wire insulation about 3/8" (1 cm) from the end of the wires.
Terminate the New Power Cable
Route the new power cable through the other strain relief on the new junction box. Tighten the
strain relief.
Strip back the cable jacket about 3" (7.6 cm).
For installations in the United States, mark the white wire with either red or black electrical tape as
required by the NEC.
Strip the end of the wires about 3/8" (1 cm).
Use approved termination devices to terminate the conductors as follows:
• Terminate the brown pigtail lead to the L1 conductor of the power cable.
• Terminate the blue pigtail lead to the L2 conductor of the power cable.
• Terminate the green with yellow stripe pigtail lead to the grounding or earthing conductor of the
power cable.
Install the cover on the new junction box.
1035472-2-G
All manuals and user guides at all-guides.com
Strip back the jackets about
3" (7.6 cm) on the field cable
and on the blower motor
From
pigtail. Then cut the unused
fourth conductor brown wire
Control
off at the point that the cable
jacket ends.
60 Hz 50 Hz
From Control
Blue
L1
L1
L2
N
Brown
GND
GND
Green w/Yellow Stripe
Blower Adapter
Board
Control
New Field
Cable To
Blower Motor
Install junction box with
cover and bonding lug
(not provided).
20
Blower Motor
Pigtail
Blower
Motor Cord
Route the cut end of the
cord to the new junction
box. Add strain relief.
Kohler Co.

Publicité

loading

Ce manuel est également adapté pour:

K-1158K-1168K-1173K-1174K-1375K-1418 ... Afficher tout