Télécharger Imprimer la page

Kohler K-8548 Guide D'installation page 8

Kit de valve inverseur
Masquer les pouces Voir aussi pour K-8548:

Publicité

Les langues disponibles

Les langues disponibles

All manuals and user guides at all-guides.com
Installation Checkout (cont.)
Open both hot and cold valves and run water through the spout
(if installed) to remove debris. Check for leaks.
Check the handshower for smooth operation.
Confirm proper diverter operation.
Turn the cold and hot handles off and then on. Verify that the
water flow is diverted back to the spout and that the handshower
is off.
Turn the valves to the closed position.
1000588-2-C
8
Kohler Co.

Publicité

loading

Ce manuel est également adapté pour:

K-8549K-10342