Télécharger Imprimer la page

Samsung BRADA BED70W Manuel D'utilisation page 7

Sèche-linge électrique

Publicité

Les langues disponibles

Les langues disponibles

installing your dryer
TOOLS NEEDED FOR INSTALLATION
Hire a professional to install this dryer properly. If there is a service call performed as a result of poor setup,
adjustment, and connection, it is considered the responsibility of the installer. If you install the dryer you are
responsible.
Make sure you have everything necessary for proper installation.
1. A GROUNDED ELECTRICAL OUTLET is required. See Electrical Requirements. See page 12.
2. A POWER CORD for electric dryers (except Canada). See page 13.
3. GAS LINES (if a gas dryer) must meet national and local codes.
4. EXHAUST SYSTEM – must be rigid metal or flexible stiff-walled metal exhaust ducting.
SEE EXHAUST REQUIREMENTS
Control panel
Door
Adjustable leg
Pliers
Cutting knife
Pipe wrench (gas only)
Nut drivers
Level
Phillips Screwdriver
Duct tape
Crescent spanner
Installing your dryer _7
BED70W-02486B_EN.indd 7
2008-01-09 ¿ÀÈÄ 6:53:10

Publicité

loading