Connecting The Gun Tower Assy To The Monitor Cabinet - NAMCO TIME CRISIS III SD Manuel De L'opérateur

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 14
4-3

Connecting the Gun Tower Assy to the Monitor Cabinet

1.
Remove 4off security screw (M5x12) and remove the Jointbox Cover.
2.
Fit, a few turns only, the 4off Whizz nuts (M8) to the studs on the Monitor
Cabinet.
3.
Fit the Joint Box over the Whizz nuts.
Security screw (M5x12)
Jointboc Cover
4.
Connect the connectors to the I/O PCB assembies.
5.
Place the Gun Tower Assy up to the Joint box. Fit 4off hex head screws (M8x15),
with flat and spring washers and tighten all screws and nuts.
Gun Tower Assy
6.
Connect the connectors.
7.
Refit the Jointbox Cover.
Connectors
Whizz nut (M8)
I/O PCB
Jointbox Assy
Jointbox Assy
Hex head screw (M8x16)
with Flat and Spring washer
Page 38
Connectors

Publicité

Table des Matières
loading

Table des Matières