BHG 720-0783DC Mode D'emploi page 14

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

6. Igniter and Battery Assembly
(a) Remove igniter cover and lock washer from
igniter. Insert igniter through from back of side
burner control panel, secure lock washer from
front of side burner control panel. See Fig.11.
(b) Install battery (T) into ignition box with positive
terminal facing outward.
(c) Replace the ignition battery cap after the
battery has been installed. See Fig.11.
Note: Make sure the igniter is assembled
with the wires upward 45°, so that the
wires are away from manifold.
See illustration below:
7.
Side Burner Valve Assembly
(a)
Remove the 2 screws that are pre-attached to
the valve. Do not screw out fully .Insert the side
burner valve into the Side Burner Shelf Control
Panel (M). Align the screws on the valve with
the large side of the holes on the bezel. Slide
the screws down to the smaller holes and
tighten the screws to secure. As shown in
Fig.12.
(b)
Remove the 2 screws that are pre-attached
under the side burner (M). Align side burner
tube over side burner valve orifice. See
Fig.13A1. Reinstall the 2 screws. See Fig.13A2.
(c)
Push control knob (S) onto valve control stem.
See Fig.14.
(d)
Insert the side burner ignition wire to the
ignition module located on the right side control
panel. See Fig.15.
Note: Only need to insert the side burner ignition
wire, the other five wires have been pre-assembled.
Fig.11
T
Fig.12
Fig.13
M
14
M
A2
A1

Publicité

Table des Matières
loading

Produits Connexes pour BHG 720-0783DC

Table des Matières