hergom ECLECSYS Serie Instructions Pour L'installation, L'utilisation Et L'entretien page 22

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

3.5.– INSTALLATION OF DEVA 100 ISLA
1 - Dismantle the metal sides by loosening the two
screws at the top (optional).
To make the cooker easier to handle, dismantle the
firebox, ashtray and oven doors and remove the lift-up
worktop and the enamelled under worktops. This will
reduce the weight of the kitchen.
2 – Once the two screws have been released, move the
sides backwards, as shown in the figure to take them out
of the front of the cooker.
2
3 – Separate the bottom frame (remove the two nuts
securing the metal sheet frame to the cooker).
27 and 28).
4 – Use the frame where you want to install the cooker
as a template for mounting (FIG. 29).
FIG. 24
1
FIG. 25
(Fig. 26,
FIG. 26
2
5 – With the ISLA stove, you can direct the flue any-
where (FIG. 30).
VERY IMPORTANT! IT IS MANDATORY to create a chim-
ney register that allows access to the horizontal under-
ground area of the appliance for preheating it during
ignition.
20
FIG. 27
FIG. 28
FIG. 29

Publicité

Table des Matières
loading

Table des Matières