Function
- General safety functions
Description of functions
When the system is switched on for the
first time, after a power failure or safety
shutdown, after a lack of gas or after the
system has been out of operation for 24
hours, the pre-ventilation period of 30
seconds begins.
During pre-purge period:
- blower pressure is monitored
- the combustion chamber is monitored for
flame signals.
At the end of the pre-purge period:
- ignition is switched on.
- main and safety valve are opened.
- burner starts.
Monitoring
The flame is monitored by an ionization
probe. The probe is insulated and fitted to
the gas head and is routed through the
flame disc into the flame zone. The probe
must not have any electrical contact with
earthed parts.The burner switches to lock-
out if a short circuit occurs between the
probe and the burner earth. During burner
operation, an ionised zone is produced in
the gas flame through which a rectified
current flows from the probe to the burner
head.
F6
8
www.ecoflam-burners.com
Safety functions
- If no flame is produced when the burner
is started (gas release), the burner will be
switched off at the end of the safety period,
and the gas valve will close.
- If the flame goes out during operation,
the gas supply is interrupted and the
control unit goes to block.
- If there is a lack of air during reventilation
or operation, the control unit goes to block.
- If there is a lack of gas, the burner does
not begin operation or switches off.
In the event of controller shutdown
- Controller thermostat interrupts heat
request.
- Gas solenoid valves close.
- Flame goes out.
- Burner motor switches off.
- Burner is ready for operation.
119 pBr
Y13
119.1
104
119.2
Y12
F4
106
108
119
F4
Minimum gas pressure switch
F6
Air pressure switch
Y13
Main solenoid valve
Y12
Safety solenoid valve
1
Thermally-triggered safety shut-off valve
(installation by installer)
104
Gas pressure regulator
106
Filter
108
Gas ball valve (installation by installer)
119pBr Measuring point for gas outlet pressure
119.1
Measuring point for gas pressure in valve space
119.2
Air pressure measuring point