Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 36
E-SMART

Gearbox assembly

Place the axis as shown in the figure with the gear assem-
bly component facing upwards.
Assemble the flange (1) on the gear and tighten the screws
(2) until the torques shown in Table 2 are reached.
Place the gearbox complete with flange on the unit without
locking it.
Insert the spacer (3) from below and then insert the Shrink
disk (4) without locking it.
Tighten the flange fixing screws (5).
Screws 5
Screws 2
Spacer 3
Shrink
4
Code*
6000791
6005737
6005738
6005739
6005734
6005735
6005736
6005730
6005731
6005732
* The code refers to the purchasing of the single shrink disk. In case of purchasing a gearbox assembly KIT (flange, shrink disc and screws), please refer to the dxD dimensions to identify the shrink disc.
UM-4
Gearbox
Flange 1
Fig. 11
Hollow shaft
Shrink disc
[mm]
dxD [mm]
22
12x22
14x34
34
16x34
19x34
19x41
41
22x41
25x41
22x50
50
25x50
32x50
Tightening sequence of the shrink disc screws:
Tighten the two diametrically opposite screws until the
surfaces are in contact with the shaft and hub.
Tighten all the screws to 50% of the value of the tighte-
ning torque indicated in Tab. 3 in a crossed sequence.
Repeat the same operation at 100% of the tightening
torque indicated in Tab. 3.
Check, in continuous sequence, that the tightening tor-
que has been reached.
Loosen and then tighten the gear fixing screws (5) until the
torques shown in Table 2 are reached.
Screw
8.8
M2
M2.5
M3
M4
M5
M6
M8
M10
Screw
M2.5
M4
M4
M4
M4
M4
M4
M5
M5
M5
Tightening torque
[Nm]
0.4
0.7
1.3
2.8
5.6
9.6
23
46
Tab. 2
Tightening torque
[Nm]
1.1
3.1
3.1
3.1
4.3
4.3
4.3
8.5
8.5
8.5
Tab. 3

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Rollon e-smart 50Rollon e-smart 80Rollon e-smart 100

Table des Matières