Timken ROLLON E-SMART 30 Mode D'emploi page 5

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 36
Driving belt replacement
Head removal
First of all carry out the operations indicated at points 1-2
4) For sizes 80 and 100 unscrew the two screws on the
head extremity (fig. 7).
Sliding block replacement
First of all carry out the operations indicated at the points
1 - 2 on the side of the block to be replaced
6) The head on the same side of the block wich has to be repla-
ced must be detached from the profile. Follow the steps 4-5.
First of all carry out the operations indicated at the poin-
ts 1 - 2 for both ends of the carriage
3) Remove the driving belt from both ends of the carriage
(Fig. 5) and pull off (Fig. 6). To re-assemble the belt, carry
out the same operations in the opposite way repositioning
the belt tensioner at the initial distance X.
Take particular care to center the belt with regard to
both the running seat and the blocking position of the
Fig. 6
belt tensioner.
5) For sizes 30 and 50 unscrew the four screws on the head
fixing flange (fig. 8).
Fig. 7
7) Remove the fixing screws on the top of the carriage (Fig. 9).
8) Pull off the sliding block (Fig. 10). To re-assemble the sliding
block, carry out the same operations in the opposite way.
Fig. 9
Smart System
Fig. 8
Fig. 10
UM-3

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Rollon e-smart 50Rollon e-smart 80Rollon e-smart 100

Table des Matières