Operation Check - Elkron EL50RT 2PH 60m Manuel D'installation

Barrières extérieures à infrarouge
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

- Place attenuation sheet on Receiver lens repeating 4 & 5 to obtain the maximum voltage from the volt-
meter.
- Taking off attenuation sheet, meter probe.
SENSITIVITY CHART
Monitor Jack Output
700 mV Over
250mV to 700 mV
250 mV Under
NOTE:
(1) Above readings is under attenuation sheet operation.
(2) Carefully remove the attenuation sheet, and check the voltage from the monitor jack again.
Receiver

OPERATION CHECK

Monthly check is required, test operation by walk testing the beam
Alignment Level
Best
Good
Poor Realign
Monitor jack (+)
Meter Probe (+)
Meter Probe (-)
Attenuation Sheet
16/28
Alarm LED
Attenuation LED
Monitor jack (-)
EL50RT 2PH 60m

Publicité

Table des Matières
loading

Table des Matières