B. Pole mounting
- Unit mounts to a 4 -4,5cm O.D. Pole.
- Drill a 8mm hole through pole where the beam will be mounted for wiring.
- Place U-Shape brackets at the pole.
- Pull out the wire through the wire through the wiring hole of the mounting plate, attached the mounting plate
to the U-Shape bracket with screw.
- Connect the wire to the terminals.
- Checking optical alignment and operation check.(Please see ALIGNMENT AND OPERATION).
- Replace the cover, and fasten the cover lock screw tightly.
C. Two units installation (back to back)
- Fix two U-Shape brackets in layers on a pole, two units can be installed back to back on a pole at the same
height.

5.0 RESPONSE TIME ADJUSTMENT

The beam interruption time adjustment is on Receiver unit. Speeds shown below are the maximum detectable
speeds for each setting.
Response time (sec.)
Note: After installation, response time testing is required. This function allows you to match the units
sensitivity to its surroundings.
Fast running Normal walking
14/28
Slow speed
EL50RT 2PH 60m