Ce Marking; Set-Up; Checking The Scope Of Delivery; Installation - Vaillant recoVAIR VAR 60/1 D Notice D'installation

Masquer les pouces Voir aussi pour recoVAIR VAR 60/1 D:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 59

4 Set-up

3.3

CE marking

The CE mark shows that the products comply with the basic
requirements of the applicable guidelines as stated on the
data plate.
The manufacturer hereby declares that the type of radio
equipment that is described in these instructions complies
with Directive 2014/53/EU. The complete text for the EU De-
claration of Conformity is available at: http://www.vaillant-
group.com/doc/doc-radio-equipment-directive/.
Frequency band: 863–870 MHz
Maximum transmission power: < 25 mW
4
Set-up
4.1

Checking the scope of delivery

Check that the scope of delivery is complete.
Quantity
Contents
1
Front panel
1
Wind protection
1
Wall-mounting frame
1
Fan unit
1
Regenerator with two filters
1
Operating instructions
1
Installation instructions
5

Installation

5.1
Observing the requirements for the
product's installation site
The product can be installed in flats, cellar rooms, storage or
utility rooms, and in attics.
Observe the current applicable national construction reg-
ulations.
Ensure that the installation site is dry and is frost-proof
throughout.
When determining the installation site, take into consider-
ation the product's sound power level and sound reduc-
tion index.
→ Technical data in the appendix
Take into consideration the diameter of the pipe and the
minimum clearances to ceilings, windows and corners.
32
5.2
Installing the pipe from the pre-installation
set
1.
Insert the pipe from the pre-installation set into the des-
ignated position on the external wall.
In doing so, observe the set-up instructions that are
enclosed with the product.
2.
Ensure that the power supply cable and the control
cable are not damaged when you drill through the wall.
5.3

Installing the outer hood

Install the outer hood and its wall-mounting frame.
In doing so, observe the set-up instructions that are
enclosed with the product.
Use suitable rawl plugs and flat-head screws.
5.4

Preparing the wall-mounting frame

6
4x
1.
Mark the positions for the four drill holes.
6,5 cm
7 cm
2.
Take into consideration the dimensions for the opening
for installing the electrical connections and for setting
up the wall-mounting frame.
3.
Take into consideration that the power supply cable will
need to be laid correctly under the plaster.
4.
Ensure that the power supply cable and control cable
are not damaged.
5.
Drill the holes into the wall.
Installation instructions recoVAIR 0020236694_06

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Recovair var 60/1 dw

Table des Matières