AT END OF DAY:
RELEASING STEAM PRESSURE
To prolong the life of the boiler and its components, we recommend that this task be
performed at the end of the day.
1. Turn off the boiler
switch.
EVERY WEEK:
FLUSHING THE BOILER OUT
To prevent limescale deposits, the boiler should be drained every week.
1. Should be completed
in the morning or when
the boiler is cold with
zero pressure.
4. The unit is now ready to be filled with water.
11
RELIABLE 5000 SERIES JEWELRY STEAMER
2. Press the pedal until the pressure drops to zero.
4. To complete the
shutdown of the boiler,
turn the steam switch off.
2. The safety cap
should be open. If it's
not, please remove the
cap completely.
MAINTENANCE SCHEDULE
3. Open the drain valve
and allow the water to
be emptied into a large
container or sink.
3. Open the filler
safety cap slightly to
allow the remaining
steam to release.
Reliable Support & Service
1-800-268-1649
support@reliablecorporation.com

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

5000is5000cj5000cd

Table des Matières