Attach The Rail To The Header Bracket - Chamberlain LiftMaster Professional SECURITY+ 2585C 3/4 HP Manuel Du Propriétaire

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Header Wall
Header
Bracket
Belt Pulley
Bracket
Garage
Door
HARDWARE SHOWN ACTUAL SIZE
Clevis Pin
5/16"x2-3/4"
INSTALLATION STEP 3
Attach the Rail to the Header
Bracket
• Position the opener on the garage floor below the
header bracket. Use packing material as a
protective base. NOTE: If the door spring is in the
way you'll need help. Have someone hold the
opener securely on a temporary support to allow
the rail to clear the spring.
• Position the rail bracket against the header
bracket.
• Align the bracket holes and join with a clevis pin
as shown.
• Insert a ring fastener to secure.
Header
Bracket
Clevis Pin
5/16"x2-3/4"
Belt Pulley
Bracket
Ring Fastener
10
Ring
Fastener
Rail
Temporary
Support

Publicité

Table des Matières
loading

Table des Matières