INSTALLATION
⚠ The following illustrations are examples. The space for fastening the barrier and accessories varies depending on where it is installed. The
installer must find the most suitable solution.
⚠ Caution! Use hoisting equipment to transport and position the barrier.
During set-up and installation, the barrier could be unstable and tip over. Be careful and do not lean on it until it is fully fastened.
Preparing the fastening plate
⚠ If the flooring does not provide a sturdy surface to fasten the cabinet to, use a cement slab.
Dig a hole for the foundation frame.
Prepare the corrugated tubes you will need for the cables coming out of the junction pit.
 The number of tubes depends on the type of system and the accessories you are going to fit.
r 40
Prepare a foundation frame that is larger than the anchoring plate and sink it into the dug hole.
Insert an iron cage into the foundation frame to reinforce the concrete.
Attach the four anchoring clamps to the anchoring plate.
Place the plate over the iron cage.
Fill the foundation frame with concrete. The base must be perfectly level and the bolts entirely above surface.
Wait at least 24 hrs for the concrete to solidify.
Remove the foundation frame.