Chapin 80100A Mode D'emploi page 2

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

ASSEMBLY INSTRUCTIONS
Approximate assembly time is 5-10 minutes
Suggested Tools:
Wrench and/or Ratchet Set
• Remove bottom bolt from each side of handle
(below triangle shaped thumb screws).
• Loosen thumb screws and flip up handle
• Replace bolts below thumb screws and
tighten down.
• Tighten thumb screws completely.
* Note: If spring detaches from bail assembly,
simply re-attach (see Figure A).
GENERAL OPERATING INSTRUCTIONS
• Be sure gate control is in the closed position (do not hold bail down when filling)
• Determine appropriate setting for material being used by reading the suggested setting on the material's bag AND/OR by referencing the
application chart on your spreader's control panel (Charts provided are only guidelines. Be sure to read the instructions on the bag/box of the
material you're spreading to identify accurate setting needed)
• Set the dial to the desired setting Important Note: Do not adjust dial while holding bail down and gate is open. This will alter the accuracy
of gate settings and cause parts to break.
• To begin spreading, start walking (about 3 mph pace) and pull the bail system down to open gate
• To stop spreading simply let go of the bail and the gate will close
BAFFLE OPERATING INSTRUCTIONS
• Adjust baffle by hand to block distribution accordingly.
• Use wing nuts to adjust tension on baffle.
AUGER INSTALLATION
• Screw auger onto impeller shaft. Screw
auger retaining nut into auger hole with M6
socket driver. Tighten completely with
wrench to secure.
CHAPIN INTERNATIONAL, INC. P.O. BOX 549 700 ELLICOTT ST. BATAVIA, NY 14021-0549 www.chapinmfg.com 800-950-4458
Thumb
Screws
Bolts
Handle
Figure A

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

80080a

Table des Matières