Télécharger Imprimer la page

Component Installation - Camoplast ATV T4S Mode D'emploi

Système de traction
Masquer les pouces Voir aussi pour ATV T4S:

Publicité

CAMOPLAST T4S ATV TRACK SYSTEMS
INSTALLATION AND ADJUSTMENT CHECKLIST
** Steps in this checklist are laid out in logical order. They should be performed in
succession to optimize the track system installation on the vehicle. **

1 - COMPONENT INSTALLATION

A - INSTALLATION OF REAR ANCHOR BRACKETS
* Refer to Installation Guidelines section entitled "Rear track systems"
-------------------------------------------------------------------------------------------------------------------------------------------
B - INSTALLATION OF FRONT ANCHOR BRACKETS
* Refer to Installation Guidelines section entitled "Front track systems"
-------------------------------------------------------------------------------------------------------------------------------------------
C - INSTALLATION OF STEERING LIMITERS
* Refer to Installation Guidelines section entitled "Front track systems" . ** Do not adjust
the Steering Limiter sets before having adjusted the tracks' angle of attack.
2 - COMPONENT ADJUSTMENT
A - ANGLE OF ATTACK
* Refer to Adjustment Recommendations section entitled "Angle of attack"
-------------------------------------------------------------------------------------------------------------------------------------------
B - TRACK ALIGNMENT
* Refer to Adjustment Recommendations section entitled "Track alignment"
-------------------------------------------------------------------------------------------------------------------------------------------
C - TRACK TENSION
* Refer to Adjustment Recommendations section entitled "Track tension"
-------------------------------------------------------------------------------------------------------------------------------------------
D - STEERING LIMITER ADJUSTMENT
* Refer to Installation Guidelines section entitled "Front track systems"
3 - INTERFERENCE CHECK
IN THE EVENT OF INTERFERENCE BETWEEN THE VEHICLE AND TRACK SYSTEM, SOME PARTS ON
THE VEHICLE MAY HAVE TO BE REMOVED OR MODIFIED, OR A LIFT KIT MAY HAVE TO BE
INSTALLED. IF APPLICABLE, SEE INSTALLATION GUIDELINES SECTION ENTITLED "COMPLETION".
4 - TEST RUN
1.5 - 3 KM ( 1 OR 2 MILES) TEST RUN
5 - POST TEST RUN FINAL CHECKS
A - ANGLE OF ATTACK
* Refer to Adjustment Recommendations section "Angle of attack"
-----------------------------------------------------------------------------------------------------------------------------------------
B - TRACK ALIGNMENT
* Refer to Adjustment Recommendations section "Track alignment"
------------------------------------------------------------------------------------------------------------------------------------------
C - TRACK TENSION
* Refer to Adjustment Recommendations section "Track tension"
(if applicable)
(if applicable)

Publicité

loading