Venting Instructions - Dunkirk DCC-150 COMBI Manuel D'installation, D'utilisation Et D'entretien

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

4.2

VENTING INSTRUCTIONS

4.2.1
Concentric venting
• Examine all components for possible shipping damage, prior to installation.
• This venting system must be free to expand and contract.
• The venting system must be supported in accordance with these instructions.
• The vent system must have unrestricted movement through walls, ceilings and roof penetrations.
• Check for proper joint construction when joining pipe to fittings.
• If venting is penetrating ceilings and floors, the openings must have firestopping provided in joist areas and the installation of
firestop spacer assemblies.
• Roof flashing parts are shown in the manual. Standard roof flashing methods must be employed to install the roof flashing.
• Wall and roof openings must be framed to provide support and the attachment of termination assemblies.
Please Note:
The manual uses the terms 'vent' , 'venting' and 'flue' interchangeably. A ll references t o ' flue' ar e sy nonymous wi th 'v ent' or
'venting'.
NOTICE
Check all measurements before cutting. Clearance to combustible materials when using a concentric vent system is
zero.
NOTICE
All concentric venting must be fastened together using screws.
Note: Dual flue venting is not to be fastened with screws. This procedure only pertains to concentric venting.
18
x
Y
240011373, Rev. G [03/31/2017]

Publicité

Chapitres

Table des Matières
loading

Ce manuel est également adapté pour:

Dcb-125 heating only

Table des Matières