Setting Up Room For Shower Tray And Shower Enclosure; Equipment; Fittings Technical Data - HOESCH SensePerience Serie Mode D'emploi

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 17

01.01 Setting up room for shower tray and shower enclosure

Separate electrical units should not be used inside the cabine.
The cabin is designed for setting up in front of the wall.
The wall drain must be installed in the indicated area.
Observe ceiling height of the room when installing the steam cabin with platform provided by customer.
Make sure there is a clearance of at least 120mm from the top of the cabin to the ceiling.
The cabin has been designed for installation on masonry walls, in order to ensure a reliable fastening.
The walls must be completely tiled over the cubicle's entire height before the fi tting.
The fl oor at the place of installation must be completely fl at.
When preparing the assembly stand (version D) in the area of steam cabin a slope for water runoff should be ensured. The
right ground level for glass sheeds fi xing and outside the cabin for door opening should also be guaranteed. For this purpose
please use the attached template.
For the assembly of the shower tray (version B and C), a concrete fl oor or a styrofoam carriers can be used. Please pay
attention to the manufacturer's specifi cations. Load capacity of a minimum 250 kg/m² should be guaranteed.
Walls must be straight.
For constructional reasons in case of frameless shower enclosures absolute waterproofness is not possible.
For the safety reasons this device should not be used by physically and mentally disabled people (and children) or by people without
relevant experience or knowledge, unless they use it, under supervision of relevant persons or get the instruction how to use it.
Children should use this product only under adult's supervision.
Attention: due to high temperature within the working area of steam jet and at steam outlet, direct skin contact should
GB
be avoided.
- warning! Hot surface!
Silicone must be provided by building constructor. Please keep in mind that maintenance joints may require
cleaning.
02

Equipment

Back walls in white made of of toughened safety glass with EverClean coating
Frameless glazing (8 mm) made of toughened safety glass with EverClean coating.
Roof, made of glass (6 mm)
Shower tray (optionally) made of mineral cast (including premounted base)
Integrated capacitive operation panel (behind glass)
Steam generator with automatic rinse and decalcifi cation, Nominal voltage 230 V, 50/60 Hz
3.3 kW for square 1000x1000, rectangular 1200x1000 and quarter circle 1000x1000
4.0 kW* for rectangular 1400x1000, 1600x1000, 1800x1000
Steam jet
Panel made of glass -two functional panels for rectangular versions 1600x1000, 1800x1000
Chrome – plated fi ttings:
Shower head with shower reling, Rain shower (8l/min), Cascade shower integrated in rain shower, Mist jet integrated in rain
shower, Thermostat 1/2°, 1 shut-off valve
Rain shower cascade and mist jet controlled electronically
Sound module with radio, 2 speakers,
Bluetooth
LED-stripe with colour changer in the roof
A stool made of stainless steel with PU seat – for rectangular version 1600x1000 and1800x1000 two stools are integrated
Hinges with lifting mechanism

02.01 Fittings technical data

Recommended fl ow pressure:
Hot water temperature:
Recommended hot water temperature:
Temperature range:
Safety cut-off :
*
3,3 kW for Switzerland
12
200-500 kPa
max. 90°C
60-70°C
20-60°C
38°C

Publicité

Table des Matières
loading

Table des Matières