Initial start-up

HL 90
10
Initial start-up
After you have installed the heater, bleed the fuel supply system
carefully.
NOTE
If the fuel lines are long, it may be necessary to switch on several times
in order to fill the fuel line to the heater.
Conduct a trial of the heater to check all the connections for leaks and
to ensure that they are secure. If the heater suffers a fault during
operation, the fault must be located and remedied.