GE RAK348T1 Instructions D'installation page 8

Masquer les pouces Voir aussi pour RAK348T1:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

INSTALLATION INSTRUCTIONS
INSTALL THE RECEIVER
5500 and 5800 SERIES ZONELINE MODELS
ELECTRICAL SHOCK HAZARD—Turn off power at
the main service panel by removing the fuse or
switching the appropriate circuit breaker to the
OFF position before installing the thermostat
receiver.
1. Remove the room cabinet by
pulling it out at the bottom to
release it (1), then lift it up to
clear the rail along the unit
top (2).
2. Move the #4
(CLASS 2) dip
switch up to
enable the unit
to operate with
a Class 2
Thermostat.
(cont.)
CLASS 2 (Remote
Thermostat)
8

Publicité

Chapitres

Table des Matières
loading

Ce manuel est également adapté pour:

Rak364t1

Table des Matières