In order to adapt flow rate to the existing pressure, you have
to adjust flow rate on stop cock.
Separate stop cock
CLEANING AND SERVICING
• Chrome cleaning : Clean the plated chrome with mild soap
and water, with a soft cloth.
DO NOT USE ABRASIVE or chlorin cleaners.
• Risk of freezing : Flush out the supply, and push on several
times to flush out the valve.In case of freezing, remove the
complete cartridge containing the mechanism and store it.
Attention : never grease the internal mechanism.
• Check pipe sizing to avoid water hammer, pressure and flow rate
losses. (see our brochure or web site).
• Protect hydraulic installation by general filters and pressure
regulator in order to reduce maintenance frequency.
• A service valve should be fitted in close proximity to sanitary taps to
simplify maintenance.
FLOW RATE ADJUSTMENT
Integrated stop cock :
Adjust flow rate on stop screw of the valve
GB
GB