Télécharger Imprimer la page

Barazza 1KBC1SP6 Notice De Montage page 17

Publicité

Les langues disponibles

Les langues disponibles

BEFORE ELECTRICAL INSTALLATION
Before connection you must:
check that the electrical data indicated are in conformity with the main voltage and
frequency values of the building where the hood is to be installed;
check that the building is fitted with electric safety systems to protect against short
circuits and electric shock systems, according to the laws in force;
install an electric socket (or connection point) with a bipolar switch, which has
contacts with an opening of at least 3 mms;
if it is wished to install the hood with a plug, it is necessary that you have access to
the plug;
always turn off the main voltage supply by means of the bipolar switch before
connecting and switch on again only when connections have been completed, tested
and are safe.
If the light of the lamps is weak when the hood is in stand by, then invert the phase
of the plug/socket.
PRECAUTIONS TO BE TAKEN IF REPAIRS ARE TO BE CARRIED OUT
Repairs, including the replacement of the feed cable if necessary, are to be carried out
only by qualified personnel, using standard methods, instruments and materials. Any
repairs carried out by others could prove to be dangerous and could be a fire risk.
22

Publicité

loading

Ce manuel est également adapté pour:

1kbc1sp91kbc1sp12