36
ASSEMBLY ONTO THE BOILER
JM 3 - 6
Fix flange 2 to the boiler using 4 screws 3 interposing the insulation gasket 4. Insert the burner in the flange so
that the draught tube penetrates into the combustion chamber by the length suggested by the boiler manufacturer.
Tighten bolt 1 to lock the burner in position.
JM 9
Fix flange 2 to the boiler using 4 screws 3 interposing the insulation gasket 4 and the possible insulating cord
5. Insert the burner in the flange so that the draught tube penetrates into the combustion chamber by the length
suggested by the boiler manufacturer. Tighten screw 1 to lock the burner in position.