Description Of The Unit; Preparations For Fitting The Bathtub; Fitting The Bathtub - Roca EMOTION Manuel D'installation Et D'utilisation

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 15
- IMPORTANT:
- Fit the bathtub before installing the side legs.
- If you purchased an Emotion lighting kit, bear in mind point no.
8, Electrical installation.
Install it before you finish fitting the bathtub for easier assembly.
- For the drain to work properly, you must make sure the connec-
tions are correctly tightened.
- There must be an earth connection for the structure's equipo-
tential connection.

4. DESCRIPTION OF THE UNIT

Once you have unpacked the bathtub, check you have all the ele-
ments.
1.- Bathtub unit with panel fitted.
2.- Pop Up Waste installed.
3.- Bag with:
- User's handbook.
4.- Box of accessories with:
- Set of cleats with covers and suction pads fitted.
- 2 Sets of legs (right and left) with silicone joints.
- 4 Bases.
- 2 Bags of nuts and screws.
5. PREPARATIONS FOR FITTING
THE BATHTUB
As a prior consideration to fitting the bathtub, you must bear in
mind that both the drain and the 230 V socket for the lighting kit
must be located approximately within a 570x540-mm rectangle,
as shown in the diagram below.

6. FITTING THE BATHTUB

1. Place the bathtub in the desired location, bearing in mind the
position of the drain. Position the 4 brackets, without fixing them
(around the swivel piece) using the nuts and washers (supplied in
one of the bags) in the inserts in the legs. Mark the position of the
drill holes on the floor.
570 mm
2. Remove the bathtub and drill the floor using a no. 6 drill bit.
Then insert the plugs.
3. Check that the distance between the top edge of the bathtub
and the floor is 565 mm. If this is not the case, adjust the legs.
4. Put the bathtub back in position, aligning the brackets with the
drill holes.
5. Connect the drain, using a flexible pipe to compensate for pos-
sible movements.
Remember to check that there are no water leaks before completely
sealing off the enclosure
6. Fix the bathtub to the floor using the hexagonal screws.
7. Place an earth connection in the required location on the
frame, which is marked with the symbol (fig. 2) and in position
no. 3 in (fig. 4).
Fig. 2
8. If you have purchased an Emotion Lighting Kit, install it next:
- Make the electrical connection bearing in mind the rec-
ommendations given in point no. 8.2. POWER CONNECTION.
- Place the L-shaped brackets as shown in fig. no. 3,
fixing them to the frame using the plastic flanges, following the
steps explained below.
Fig. 3
11

Publicité

Table des Matières
loading

Table des Matières