INE SKYLINE HFP3000 Manuel D'instructions page 31

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

INE SpA Via Facca, 10 - 35013 Cittadella - PADOVA - ITALIA Tel. 049/9481111 - Fax 049/9400249 - ine@ine.it - www.ine.it
Duty cycle: balance between welding current timing
and base current timing (e.g., a 50% duty cycle
means that welding current timing equals the base
current timing, a 30% duty cycle means that the
welding current timing is lower than the base current
timing).
Start current: value of initial current or first level (in
Amperes or %).
Final current: value of end current or third level (in
Amperes or %).
Start time: duration of initial current or first level
(only for 2-level mode and advanced 2-stroke).
Final time: duration of end current or third level (only
for 2-level mode and advanced 2-stroke).
Current 2: second level current value (in Amperes or
%); only for 2-level mode.
Welding time (SPOT): duration of a welding cycle.
Tack: duration of initial pulse to start bonding the
pieces, starting from the outer edge without too
much deformation (available only in TIG DC).
Maximum current of remote control: allows to set
the maximum value of the current for the remote
control.
Page 29

Publicité

Table des Matières
loading

Produits Connexes pour INE SKYLINE HFP3000

Ce manuel est également adapté pour:

Skyline hfp4000Skyline hfp5000

Table des Matières