Transport, unpacking and components
6

UNPACKING AND POSITIONING

IMPORTANT: the machine must
be unpacked and positioned
by a specialised authorised
technician. To avoid possible
hygiene risks, we recommend
leaving the machine in its
packaging until the moment of
installation.
6.1

UNPACKING THE MACHINE

To remove the machine from the package, pro-
ceed as follows:
- Remove the top cover.
- Remove the side panels.
- Remove the internal protection.
- Make sure the machine is in good condition.
- Remove the plastic bag.
- Extract the accessories, instruction booklet, etc.
- Verify conformity of the shipment.
Keep away from children's
reach every packing element
(plastic bags, cardboard, nails)
since they are source of danger.
Collect and send them to
recycling centers.
Possible damage, faults or
non- conformities must be
communicated rapidly, within
8 days from receipt of the
machine. Otherwise the goods
are deemed accepted.
6.2

LIFTING THE MACHINE

The machine must be lifted manually by four or
more people located on opposite sides of the
machine, holding it by the frame/feet under the
base.
The machine may also be lifted by a block and
tackle, inserting the straps under the base and
attaching the other end to a beam to avoid
crushing the outer panels.

6.3 POSITIONING THE MACHINE

Position the machine in its definitive location,
making sure that:
1) The machine must be used on a ground in
raised position which cannot be the ground floor
2) The surface it rests on is sufficiently strong and
stable to support the weight of the machine and
that the top is perfectly horizontal;
3) There are at least 3,9 inch between the walls
and the back and side panels of the machine to
guarantee correct ventilation;
4) The top of the machine (cup warmer) is at least
59 inch from the floor;
5) Near the machine, there is a knock box to
dispose of the grounds and a space for the grinder
doser;
6) Near the machine, there is an electrical panel to
connect the machine electrically, a drain and a tap
to connect the water supply.