Installation Of Control Unit - Cedes cegard/Max C/CM Mode D'emploi

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Installation and operation manual

5.2. Installation of control unit

15 ... 25 VAC
17 ... 240 VAC/DC
15 ... 30 VDC
N
24 V
P
GND
common
common
nc
nc
no
no
GND
GND
Test
Test
© CEDES/May 2012
IP54
IP54
CEDES
CEDES
part No. 102 336 resp. 102 407
part No. 102 336 resp. 102 407
17...240VAC/DC resp. 24 V
17...240VAC/DC resp. 24 V
WAGO 6 x 5.08
250 VAC / 8 A
125 VDC / 0.5 A
30 VDC / 8 A
min. 5 VDC / 10 mA
Switch
JP1
0 ... 10 s (Timer)
R x connector
Tx connector
W ago 2 x 5.08
W ago 6 x 5.08
Potentiom eter
JP1 Jum per
Switch
 Fix the control unit with 4 screws near the door drive
 Connect terminal protective earth PE with low
impedance (< 10 ) to protective earth of the power
supply
 Connect Tx and Rx connector edge to the control
unit.
-
White connector = Tx edge
-
Blue connector = Rx edge
 6-pole orange connector = Power
 2-pole orange connector = Test input
Hold time of relay:
Hold time of the relay can be delayed after the protective
area is free. Delay time is adjustable with the
potentiometer 0 ... 10 s. Default is 0 s.
Jumper JP1:
JP1 set = Criss-cross beam mode on
JP1 off = Criss-cross beam mode off
Buzzer:
Switch On / Off using switch S as desired. Automatic
calibration is activated, if switched 'Off'.
www.cedes.com
cegard/Max C/CM
5

Publicité

Chapitres

Table des Matières
loading

Table des Matières