Friedrich ZStar ZQ05 Mode D'emploi page 12

Masquer les pouces Voir aussi pour ZStar ZQ05:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Installation Instructions
4. SECURE THE GUIDE PANELS
Extend the guide panels (TYPE F) to fill the window
opening using 4 screws (TYPE B) to secure them, as
shown in Fig. 12.
5. INSTALL THE SASH SEAL AND SASH LOCK
a. Cut the sash seal (TYPE E) to the window width.
Stuff the sash seal between the glass and the
window to prevent air and insects from getting into
the room, as shown in Fig. 12.
b. Fasten the L bracket using a screw (TYPE A), as
shown in Fig. 12.
6. a. Remove the screws that secure the cabinet and
base pan in the right side.
b. Fasten the suport bracket (TYPE G) using a
removed screw. Attach the suport bracket (TYPE G)
in the inner window sill with a screw (TYPE B), as
shown Fig. 13.
7. Window installation of room air conditioner is now
completed. See ELECTRICAL DATA for attaching
power cord to electrical outlet.
REMOVAL FROM WINDOW
Turn the air conditioner off, disconnect the power cord, remove the L bracket, the screws and Support Bracket
installed through the top and bottom of the guide panels, and save for reinstallation later. Close the guide panels.
Keeping a firm grip on the air conditioner, raise the sash, and carefully tilt the air conditioner backward, draining
any condensate. Lift the air conditioner from the window and remove the sash seal from between the windows.
Electrical Data
Line Cord Plug
Do not under any
circumstances cut
or remove the
grounding prong
from the plug.
Power supply cord with
3-prong grounding plug
L BRACKET
TYPE A
TYPE B
Fig. 12
Fig. 13
Use Wall Receptacle
Standard 125V, 3-wire grounding
receptacle rated 15A, 125V AC
10
SASH SEAL
(TYPE E)
TYPE B
Support Bracket (TYPE G)
Power Supply
Use 15 AMP, time
delay fuse or circuit
breaker.

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Zstar zq07

Table des Matières