Télécharger Imprimer la page

Artweger TWIN:LINE 2 Serie Installation Utilisation Entretien page 17

Publicité

Les langues disponibles
  • FR

Les langues disponibles

BATHING
INTHE TWINLINE 2
1.) Move the locking element to "Duschposition"
("Showering position"). The door is not lok-
ked, thedrain is open. (fig 1)
2.) By lifting the end of the handle upwards you open
the shower door inwards. (fig 2)
3.) When you shut the door it clicks into place auto-
matically and remains in this position.
4.) Move the locking element to "Badeposition"
"Bathing position"). Now the door is locked;
it is no longer possible to open it.
At the same time the drain is closed off. Now you
can fill the bathtub. (fig 3)
5.) After having taken your bath, return the lok-
king
element
to
("Showering position") (fig 1). Now the drain is
open again, the water runs out and the door is
unlocked.
Applies only to the Whirlpool Twinline Air: The jets are
automatically blow dried after showering. This pro
cess begins approximately 20 minutes after the end of
the shower and lasts for approximately 3 minutes.
ATTENTION : Wait to open the door until all the water has run out! Never leave children or
persons with general learning disabilities unsupervised!
17
the
"Duschposition"
1
2
3

Publicité

loading