Installation - Klarstein VICTORIA Mode D'emploi

Hotte aspirante
Masquer les pouces Voir aussi pour VICTORIA:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

INSTALLATION

Note: The specified values are [mm].
(Solution 2)
Wall Drilling and Bracket Fixing
As a first step, proceed with the following drawings:
• A vertical line up to the ceiling or up to the upper limit, at the center of the area in
which the hood is to be fitted.
(A) A horizontal line A at 980 – 1080 mm above the cooker top.
(B) A horizontal line B at a X mm above the horizontal line A.
(C) A horizontal line C at a 261mm below the horizontal line A (only valid
for „Solution 2").
Vertical line
Option
Chimney
1
400+0
2
400+300
3
400+390
EN
X
/
390-620
390-710
29

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

1003370910033710

Table des Matières