CLAS PE 6004 Mode D'emploi page 41

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

PE 6004
PE 6001
DOUBLE SCISSOR LIFT DUAL CYLINDER 3.5T
DOUBLE SCISSOR LIFT 3T
INSTALLATION OF ANCHORING BOLTS:
The installation of the anchor bolts must take place within the same installation day of the
lifter to ensure the structure's rigidity and perfect installation.
Adjust the parallelism of the base of the two platforms (as shown in Figure 4)
Attach the anchors with an electric percussion drill (the percussion pin is 16) by pocking
a 120 mm hole. Clean the hole before inserting the dowels. (Figure 22)
Use a rubber hammer to insert the dowels into the floor. (It is recommended to proceed
with the insertion of the joints only after the leveling of the floor)
Leveling:
Use a level to adjust the draft screws on the base pull sides
If the irregularity of the platforms is due to the irregularity of the base, use an iron or concrete
plate to level the base.
When you have given the level, insert the anchor and use an attachment to secure it.
After giving the level, insert the anchor and use a hammer to secure it.
Unscrew the cover of the earth bolts
Lift test:
Turn on the machine with the «MAIN SWITCH» power button.
Press the «UP» button, pay attention to the synchronization and the lifting fluidity.
Check that there is no leakage of oil.
During the test of the lift, no person and no object and / or material must be located near the
two sides and below the lift. If an anomaly occurs, press the «EMERGENCY STOP» button to
stop the the lift immediately. After removing the obstacles, repeat the test.
Picture 22
Picture 22
Picture 23
41

Publicité

Chapitres

Table des Matières
loading

Table des Matières