Maintenance; Disposal; Final Recommendations - Key Automation TURBO 30 Livret D'instructions

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 26
DANGER: for any maintenance, strike off the supply.
The gear-motor is supplied with permanent grease lubrification and then it doesn't
require any maintenance.
For a correct system maintenance, where the gear-motor is inserted, carry on as
follows: clean and free periodically the runner and relative wheels by the debris.
The material removal has to be carried out observing the current laws.

FINAL RECOMMENDATIONS

1_Carry out the grounging.
2_Keep always apart the feeding cables from the bowden control cables.
3_Equip the system with safety devices as:
When the system overlooks a public street, it is necessary to install two of the above
mentioned devices at least (chosen among three models or also of the same type).
4_For the release it is necessary that the gate, when it is closed, doesn't push on the
stop ledges.
5_Carry out the system according to the current regulations.
6_The thrust force check must be given from the presence within the system of a
couple signaller.
7_It is absolutely necessary, the gate is equipped with the stop ledges, before the
gear-motor is installed.
8_According to the current regulations, the gate thrust force doesn't exceed
15daN.
For the setting check, make use of a dynamometer.
9_Any intervention of maintenance, repair and regulation have to be carried out by
qualified personnel.
No starting before the machine, where it will be inbuilt,
has been declared in compliance with the regulations
of the CEE rules 1998, June 22nd., n° 0037.

MAINTENANCE

DISPOSAL

-photocells
-couple limiting devices
-sensible rib
6 1 0
GB

Publicité

Table des Matières
loading

Table des Matières