Allocating The Progress Display; Terminating The Configuration Mode - eQ-3 WS300 Notice D'emploi

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

+
-
NEXT
+
-
NEXT
+
-
EXIT
46
Selecting the unit for rainfall
measurement
The unit for the rainfall quantity is displayed in the field „RAIN"
where you can chose between l/m
rain
Select the desired unit using the keys „+" and „-".
quantity
unit
Press the „NEXT" key. After that, you can allocate the
progression display.

Allocating the progress display

You can allocate the following display types to the graphic
progression display:
• atmospheric pressure
• interior temperature
• exterior temperature
If the progress display is allocated to one of the two temperature
displays, the symbol „
cerned in addition.
Overlay/identification in the display field:
P = atmospheric pressure
O = outdoor temperature
I = indoor temperature
assigning
Select the desired allocation using the keys „+" and „-".
progress
display
Press the key „NEXT", after that, the unit for the wind velocity
measurement can be entered.
Selecting the unit for wind velocity
The following units can be set:
km/h = kilometre per hour
m/s = metre per second
mph = miles per hour
The display will take place in the field „WIND".
Select the unit with which you wish to display the wind velocity
wind
using the keys „+" and „-".
velocity
F
unit
Terminating configuration mode
Press „EXIT" to complete input. This can take place at any
desired position, e.g. after setting the time etc.
" appears in the display field con-
If the „NEXT" key is pressed, the year will appear
again; the input order can commence from the
beginning again. You could now, for example,
monitor or alter the entries.
or mm.
2

Publicité

Table des Matières
loading

Table des Matières