Flash Operation; Starting The „Flash Operation; Starting The „Flash Operation" Manually - Fronius Acctiva Professional Flash UCN US Instructions De Service

Masquer les pouces Voir aussi pour Acctiva Professional Flash UCN US:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Flash operation

Starting the
1.
„flash operation"
2.
3.
4.
Charger detects that the battery is connected, carries out a self test and starts the „flash
operation".
5.
Important! Start the „flash operation" manually if:
-
-
Starting the
1.
„flash operation"
manually
For external power supply, select „flash operation" mode
Connect (+) charging terminal to positive pole on battery
Connect (-) charging terminal to negative pole on the battery, or to vehicle body (e.g.
engine block) in the case of vehicle electrical systems
Self test
E.g.: „Flash operation"
Press the Info button to display the parameters in the following sequence:
-
actual charging current
-
actual battery voltage
-
amount of charge (Ah) fed in so far
-
energy (Wh) fed in so far
-
length of time charging so far
there is no battery connected to the vehicle
the battery voltage on the connected battery is < 1.0 V
Once the charging terminals are connected, press start/stop button for approx. 5
secs
WARNING! Risk of serious damage as a result of incorrectly connected char-
ging terminals. The reverse polarity protection facility is inoperative if the „flash
operation" is started manually. Connect charging terminals to correct poles and
ensure proper electrical connection to vehicle terminals.
-
the maximum voltage command value set in the
USER menu is shown in the top half of the display
-
the current parameters are shown in the bottom
half of the display.
13

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Acctiva professional flash ucn cnAcctiva professional 30a ucn

Table des Matières