Carrier B Série Manuel D'installation, D'emploi Et D'entretien page 54

Chaudière à condensation, à ventilation directe, alimentée au gaz
Table des Matières

Publicité

Diagramme de dépannage n° 3
DIAGRAMME 1
CHART 1
OUVERT
OPEN
LE VENTILATEUR DÉMARRE
BLOWER STARTS
OUI
YES
IBC LE VOYANT DE
PURGE LIGHT ON?
BALAYAGE EST-IL ALLUMÉ?
OUI
YES
PRÉBALAYAGE DE 15 SECONDES TERMINÉ.
15 SECOND PRE PURGE COMPLETE.
IBC LE VOYANT DE BALAYAGE EST ÉTEINT.
PURGE LIGHT IS OFF. SIMULTANEOUSLY
LE VOYANT DU DISPOSITIF D'ALLUMAGE
IGNITOR LIGHT IS ON AS IGNITOR CIRCUIT
S'ALLUME EN MÊME TEMPS QUE SON
IS ENERGIZED.
CIRCUIT MIS SOUS TENSION.
OUI
YES
DIAGRAMME 4
CHART 4
GUIDE DE DÉPANNAGE
VÉRIFIER LE V CA
ENTRE LES BORNES 1 ET 3
NON
CHECK FOR VAC
NO
AU CONNECTEUR CN4 DE
BETWEEN TERMINALS 1 AND 3
LA COMMANDE INTÉGRÉE
AT CONNECTOR CN4 ON IBC
DE LA CHAUDIÈRE
OUI
YES
VÉRIFIER LE V CA AU
CHECK FOR 120 VAC AT
FILS DU VENTILATEUR DU
BLOWER LEADS ON WIRING
FAISCEAU DE CÂBLAGE
HARNESS
OUI
YES
RÉPARER/REMPLACER LE
REPAIR/REPLACE
VENTILATEUR
BLOWER
LA COMMANDE INTÉGRÉE
IBC WAITS UP TO 5
DE LA CHAUDIÈRE ATTEND
MINUTES FOR NORMALLY
PENDANT UNE PÉRIODE
OPEN AIR
NON
MAXIMALE DE 5 MINUTES
NO
PRESSURE SWITCH
QUE LES CONTACTS
CONTACTS TO CLOSE,
DU MANOSTAT D'AIR SE
INDICATING BLOWER
FERMENT INDIQUANT
SUCTION IS
UNE ASPIRATION DU
PRESENT
VENTILATEUR
NON
NO
REMPLACER LA COMMANDE
INTÉGRÉE DE LA CHAUDIÈRE
NON
NO
REMPLACER LA COMMANDE
REPLACE IBC
INTÉGRÉE DE LA CHAUDIÈRE
RÉPARER/REMPLACER LE
NON
REPAIR/REPLCE
NO
CÂBLAGE DE LA COMMANDE
WIRING FROM IBC
INTÉGRÉE DE LA CHAUDIÈRE
TO BLOWER
VERS LE VENTILATEUR
PRESSURE SWITCH
LES CONTACTS
CONTACTS
DU MANOSTAT
OPEN
S'OUVRENT.
LE TUYAU D'ÉVENT ET
ARE VENT PIPE AND AIR
LA PRISE D'AIR SONT-
INTAKE PIPE CLEAR
ILS DÉGAGÉS (AUCUN
(NO BLOCKAGE)
BLOCAGE)
OUI
YES
VÉRIFIER LE MANOSTAT
CHECK AIR
CONFORMÉMENT AUX
PRESSURE SWITCH PER
DIRECTIVES DES PAGES
INSTRUCTIONS ON
QUI SUIVENT. LES LIGNES
FOLLOWING PAGES. ARE
D'ÉCHANTILLONNAGE
SAMPLING LINES CLEAR
SONT-ELLES DÉGAGÉES
AND CONNECTED
ET RACCORDÉES
PROPERLY?
CORRECTEMENT?
OUI
YES
VÉRIFIER LES CANALISATIONS
D'ÉVACUATION DE LA CHAUDIÈRE
CHECK FLUE PASSAGES
CONFORMÉMENT AUX
IN BOILER PER
DIRECTIVES DE LA RUBRIQUE
"MAINTENACE AND
« ENTRETIEN ET NETTOYAGE ».
CLEANING". ARE FLUE
LES CANALISATIONS
PASSAGES IN BOILER CLEAN?
D'ÉVACUATION DE LA CHAUDIÈRE
SONT-ELLES PROPRES?
OUI
YES
VÉRIFIER LE RÉGIME
CHECK DRAFT INDUCER
DU MOTEUR DE
MOTOR RPM. IS IT
L'INDUCTEUR DE TIRAGE.
3400-3600?
EST-IL À 3400-3600?
OUI
YES
VÉRIFIER SI UNE HÉLICE
CHECK FOR BROKEN OR
DE L'INDUCTEUR DE
LOOSE IMPELLER ON DRAFT
TIRAGE EST BRISÉE OU
INDUCER AND REPLACE
LÂCHE ET REMPLACER
BLOWER IF FOUND TO
LE VENTILATEUR LE CAS
BE BROKEN OR LOOSE
ÉCHÉANT
REPLACE IBC
54
NETTOYER LE TUYAU
CLEAN OUT VENT PIPE
D'ÉVENT ET/OU LA PRISE
AND/OR AIR INTAKE PIPE.
D'AIR. VÉRIFIER LA PRÉSENCE
NON
CHECK FOR SAGS OR
NO
D'AFFAISSEMENTS OU
LOW SPOTS WHERE
DE POINTS BAS OÙ
CONDENSATE MAY
LA CONDENSATION PEUT
PUDDLE AND BLOCK
S'ACCUMULER ET BLOQUER
THE VENT
L'ÉVENT
NETTOYER LES LIGNES
NON
CLEAN OUT SAMPLING
NO
D'ÉCHANTILLONNAGE OU
LINES OR REPLACE
REMPLACER L'INTERRUPTEUR
DEFECTIVE SWITCH
DÉFECTUEUX
NETTOYER LES
CANALISATIONS
CLEAN BOILER FLUE
NON
D'ÉVACUATION DE LA
NO
PASSAGES PER
CHAUDIÈRE CONFORMÉMENT
MAINTENANCE AND
AUX DIRECTIVES
CLEANING INSTRUCTIONS
D'ENTRETIEN ET DE
NETTOYAGE
NON
NO
REMPLACER LE
REPLACE
VENTILATEUR
BLOWER

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Bw9aan000050Bw9aan000075Bw9aan000100

Table des Matières