Tools Required - EarthQuake E43 Manuel De L'opérateur

Masquer les pouces Voir aussi pour E43:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

aSSEmBLY

tOOLS rEquIrED:

• Two (2) 9/16" Wrenches
aSSEmBLY INStruCtIONS: (SEE FIGurE 1)
1. Insert the output shaft of the E43 transmission (A) in the open end
of the Flex Coil ShockTop (B).
2. Line up the bolt holes through the Flex Coil ShockTop and the
output shaft of the transmission.
3. Place the included 3/8-16 x 1.5 inch bolt (C) through the bolt hole.
4. Hand-thread the 3/8-16 "Bi-way" lock nut (D) on the bolt.
5. Using two 9/16 inch wrenches, securely tighten the nut and bolt.
E43 and EA6F shown. Instructions also apply to EA8F and EA10F
augers.
Check for parts online at www.getearthquake.com or call 800-345-6007 M-F 8-5
Earth Auger Powerhead E43/E43CE
C
Figure 1
Operator's Manual
A
D
B
5

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

E43ce

Table des Matières