Operation - Ardisam ION 11733 Manuel De L'opérateur

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

OPERATION

The ION is powered using the 36-volt battery supplied with the
unit.
1. Make sure your footing is secure and that you have the unit
in the vertical position firmly in your hands.
2. Compress the operating lock button, then squeeze the
operating trigger. Following a two-second safety delay, the
auger will then start drilling. SEE FIGURE 3
3. To stop the auger, release the operating switch.
4. When the auger is not in use, remove the battery.
NOTE: If you are planning to use the battery multiple times
in a single outing, it is ideal to remove the battery and
place in a warm location, this is especially important in
cold weather conditions.
BATTERY CHARGING AND MONITORING
1. Remove the rubber battery hold-down strap by pulling it
towards the motor. SEE FIGURE 4
2. Remove the battery by sliding it off of the powerhead.
3. Plug the charger into a 110/240AC outlet.
4. Slide the battery into the charger.
5. The charge indicator light should blink green.
SEE FIGURE 5
6. When indicator light is lit solid green, the battery is fully
charged.
7. Once the battery has been fully charged, unplug the char-
ger from the wall.
8. Remove the battery from the charger.
NOTE: Recharging the battery after each use is best for the
life of the battery.
9. Place the battery back onto the powerhead when ready to
use.
NOTE: Battery should be off of the powerhead when not in
use.
10. Pull the rubber battery hold-down strap back over battery.
CHARGER INDICATOR LIGHTS AND MEANING
ACTION/COLOR
Flashing green
Solid green
Flashing red
Solid red
Check for parts online at www.ioniceaugers.com or call 800-345-6007 M-F 8-5 CT
MEANING
Battery charging
Battery fully-charged
Battery too hot
Battery too cold
IMPORTANT
DO NOT LEAVE BATTERY ON POWERHEAD WHEN
AUGER IS NOT IN USE. ALWAYS UNATTACH BATTERY
WHEN NOT USING THE ICE AUGER.
FIGURE 4
indicator light
FIGURE 5
Operator's Manual
ION® Electric Ice Auger
operating
lock button
operating
trigger
FIGURE 3
battery
(step 1)
rubber battery
hold-down strap
(step 2)
7

Publicité

Chapitres

Table des Matières
loading

Produits Connexes pour Ardisam ION 11733

Table des Matières