Airflow Control Technology (Act™); Act™ Conversion - Zephyr Roma Groove ZRG-E30AS Guide D'utilisation, D'entretien Et D'installation

Masquer les pouces Voir aussi pour Roma Groove ZRG-E30AS:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Airflow Control Technology (ACT™)
Some local codes limit the maximum amount of CFM a range hood can move. ACT™ allows you to control the
maximum blower CFM of select Zephyr Ventilation range hoods without the need for expensive make up air kits.
ACT™ enables the installer to easily set the maximum blower speed to one of two most commonly specified CFM
levels; 390 or 290 CFM. The usage of ACT™ may not be necessary for your installation. Please check your local
codes for CFM restrictions.
By default the maximum blower CFM is set to 600 for ZRG.
!
CAUTION:
Hood must be disconnected from main power prior to performing the
conversion instructions listed below. Failure to do so could result in
personal injury or damage to the product.
To enable ACT™
1. Before hood installation, gain access to PC board by following the steps shown in FIG. G.
2. Change plastic jumper positioning as shown in FIG. H to set the desired maximum blower CFM.
3. Re-install PC board and continue with hood installation.
4. Remove the appropriate foil CFM sticker included with the hood literature and place inside the hood body below
the wiring diagram or in another clearly visible location.
NOTE: After re-positioning the jumper and powering on the hood, the CFM cannot be changed again.
To verify if your installer enabled ACT™
With hood off, press and hold the power button for three seconds. If 5 LEDs illuminate = defualt max. CFM, if 4 LEDs
illuminate = max. 390 CFM, and if 3 LEDs illuminate = max. 290 CFM.
When ACT™ is enabled, the number of blower speeds will be reduced. 390 CFM = max. 4 speeds and 290 CFM =
max. 3 speeds.
There should also be a foil label located inside the hood body near the wiring diagram that indicates the blower CFM.
Model: ZRG
- Locate PC board box on top of blower housing.
- Remove 2 to 4 screws a�aching PC board cover.
FIG. G
7
8
7
5
6
3
4
1
2
5
3
1
J u m p e r
Max. Blower CFM
390
PC Board
FIG. H
18
www.zephyronline.com
Jumper Pins
Plastic
7
8
Jumper
5
6
3
4
1
2
J u m p e r
5 - 6 or 7-8
DEFAULT POSITION
Default Max. Blower CFM
8
7
8
6
5
6
4
3
4
2
1
2
3 - 4
J u m p e r
1 - 2
Max. Blower CFM
290

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Roma groove zrg-m90as

Table des Matières