Initial Settings - Mitsubishi Electric PAC-SC30GRA Manuel D'installation

Système de contrôle de climatiseur pour bâtiments
Masquer les pouces Voir aussi pour PAC-SC30GRA:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

(10) Affix a caution label.
A caution label in English is supplied on the back surface of the upper panel. Affix another caution label in the
language of a country where you use the Group remote controller over the English one.
5
Connecting Optional parts
• When connecting a program timer connect a 5-core cable to connector
CN2 (timer connector) on the upper case (a 5-core cable is supplied with
the program timer).
• Cut out the thin-wall portion to take the cable.
• When fitting directly onto the wall, fit the group remote controller on the left
of the program timer to facilitate wiring. If you anticipate installing more
program timers, leave the appropriate space to the left of the remote con-
troller. See the program timer installation manual for installation details.
6

Initial Settings

• Initial settings is necessary before test run. Consult the user's manual for details of initial settings.
7
Test Run
• Test run is performed individually for each group, or for all groups.
Diagram A
CENTRALLY CONTROLLED
CHECK
ADDRESS
ON
˚C
COLLECTIVE
GROUP
D
TEMP.
I
E
Procedure
Switch layout is as shown in Diagram A.
ON/OFF
˚C
OFF
GROUP
FILTER
CHECK MODE
TEST RUN
NOT AVAILABLE
ON/OFF
FILTER
CHECK
GROUP
TEST RUN
A
c
F
B
J
CENTRALLY CONTROLLED
CHECK
G
COLLECTIVE
GROUP
H
Connector CN2
Thin-wall portion
Diagram B
ON/OFF
˚C
ADDRESS
ON
OFF
GROUP
FILTER
˚C
CHECK MODE
TEST RUN
NOT AVAILABLE
K

Publicité

Table des Matières
loading

Table des Matières