Honeywell MILLER Soll Vi-Go Mode D'emploi page 31

Masquer les pouces Voir aussi pour MILLER Soll Vi-Go:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

SÖLL VI-GO - VERTICAL ARREST SYSTEM CHECK/ACCEPTANCE SHEET
1. OPERATING COMPANY
2. INSTALLATION COMPANY
3. NAME:
4. ADDRESS:
5. HANDED OVER TO: (Operating company or its representative)(Name, signature):
6. DATE:
7. NEXT VERIFICATION ON: (IN 1 YEAR):
8. CHECKLIST (please put a tickmark):
YES NO
9.The fall arrester has been checked for perfect functioning.
10. The upper cable anchor point is always above the person to be secured.
11. All screws on the Söll Vi-Go vertical arrest system have been tightened firmly.
12. All screw joints of the ladder are firm.
13. Only anti-corrosive screw connections have been used.
14. The cable is adequately pre-tensioned. (See the cable tensioner)
15. ID plate is clearly visible.
16. A trial run has been carried out.
17. This guide has been handed over to the operating company.
18. Only the components of Honeywell Fall Protection Deutschland GmbH & Co. KG
have been used (except for the dowels for concrete).
19. COMMENTS
31

Publicité

Table des Matières
loading

Table des Matières