Installation - Assembly - Kospel EPO.G Instructions D'installation Et D'utilisation

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 14
Installation – Assembly
1. Bring the water system pipes and electric
supply cables (observing binding norms) to
the place where the unit will be fitted.
2. Take off the unit's cover: undo the screws,
slide the cover off starting from the inlet and
outlet side.
3. Fix the unit.
4. Connect (e.g. using flexible hoses) cold water
to the inlet pipe inserting a filter in between
and connect hot water to the outlet pipe.
5. Open the cold water valve and check for leaks.
6. The unit is factory adjusted to connect to sin-
gle phase supply (it's equipped with a bridge
connecting terminal clamps U and V).
7. If the unit is connected to two phases sup-
ply, the factory mounted bridge (connecting
terminal clamps U and V) has to be taken off.
8. Put the unit's cover back.
9. Make sure that there is no access to live parts
through the holes at the back plate.
16
EPO.G – must be installed with
the outlet and inlet pipes at the
bottom
EPO.D – must be installed with
the outlet and inlet pipes at the
top

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Epo.dEpo amicus 4Epo amicus 5Epo amicus 6

Table des Matières