Quick Setup Guide - Bunn Silver Serie Guide D'installation Et D'utilisation

Table des Matières

Publicité

QUICK SETUP GUIDE - JDF-2S and JDF-4S (JDF-2S shown)
1. Install door cover by first plugging the
door harness connector into the machine
harness connector located at the bottom
of the machine door.
4. Place refrigeration switch in the OFF
position.
7. Install bath tank fill tube over a nozzle as
shown.(See Initial Fill)
10. Place the refrigeration switch in the
ON position and the program switch in the
OFF position.
P3577
2. Install door cover.
5. Connect water supply to machine. (See
Plumbing Requirements)
P3582
8. Place the program switch in the ON
position.
11. Insert juice containers as shown.
P3578
3. Secure the door cover using 5 screws
provided.
6. Connect power supply to machine. (See
Electrical Requirements)
9. Hold the dispense switch until water be-
gins to flow into the tank (approx. 10 sec-
onds). When tank is full, water will begin
pour out of the overflow tube, Press the
dispense button to stop the flow of water.
12. Proceed to page 7 in the Operating and
Installation manual for calibration instruc-
P3591
tions and charts.
29
P3579
P3588
P3589
44744.2 062912

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Jdf-2sJdf-4s

Table des Matières