GE RAB24 Instructions D'installation page 3

Gaine d'acier standard pour climatiseurs 24 po à travers mur
Masquer les pouces Voir aussi pour RAB24:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

STEP 3: Installation of the case in the
wall opening
OPTION 1
and case.)
IMPORTANT:
Install case level from side to side and with a slight tilt
from front to rear. Use a level; no more than a ¼ bubble
will be the correct case slant to the outside.
in the appropriate location. Do NOT drill any holes in the
bottom of the case.
to attach the case to the wall structure.
Secure case through
side and/or top only
2" min. from
case bottom
the case.
NOTE: Do not drill any holes in the case for electrical
connections.
Installation Instructions
Inside wall
STEP 3: Installation of the case in the
wall opening (cont.)
OPTION 2
Installation of the case into wall using mounting
brackets
the included parts. Fasten brackets to sleeve with screws
Alternate applications using case mounting brackets
Frame Construction and Brick Veneer
ALTERNATE OPENING
15
"
2 x 4
FRAMING
ELECTRICAL WALL
RECEPTACLE
Solid Masonary Construction - Block
ALTERNATE OPENING
15
"
2 x 4
FRAMING
ELECTRICAL WALL
RECEPTACLE
Solid Masonary Construction - Brick and Block
ALTERNATE OPENING
15
"
2 x 4
FRAMING
ELECTRICAL WALL
RECEPTACLE
3
LINTEL PURCHASED LOCALLY
15
"
SLEEVE
LINTEL PURCHASED LOCALLY
15
"
SLEEVE
LINTEL PURCHASED LOCALLY
15
"
SLEEVE

Publicité

Table des Matières
loading

Table des Matières