Checking The Delivery For Completeness And Damage; Initial Cleaning Of The Device; Preparing The Setup Location And The Connections - Steinbach Waterpower 8500 Mode D'emploi

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 53
Careless opening of the packaging, especially with the help of sharp or pointed objects, may
cause damage to the device.
- Open the packaging very carefully.
- Do not penetrate the packaging with sharp or pointed objects.

Checking the delivery for completeness and damage

1. Open the packaging carefully.
2. Take all parts out of the packaging.
3. Check the completeness of the delivery.
4. Check the delivery for damage.

Initial cleaning of the device

1. Remove the packaging materials and all protective foils if present.
2. Clean all parts of the package content as described in the "Cleaning" section.
The device has been cleaned and is ready for use.

Preparing the setup location and the connections

Careful selection and good preparation of the setup location significantly simplifies installation and
operation of the heat pump. The following requirements must be met or considered:
- Outdoor location
- Protection from flooding and severe exposure to rain or sprinkler systems
- Stable, level ground not subject to the influence of water
- Required minimum distance to walls or objects (see Fig. D)
- Required minimum distance of 2 m to the pool.
- Easy connection of the water pipes
- Easy connection of the power supply
- Easy access to the display
- Ability to drain condensation water
- Surroundings not sensitive to vibration and noise
For a still more efficient use of the heat pump, we recommend to add our Steinbach
bypass set (item no. 060045).
NOTICE!
35

Publicité

Table des Matières

Dépannage

loading

Table des Matières