Pump Down Operation; Wiring Work - Haier 3U55S2SR2FA Manuel D'installation

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 99

Pump Down Operation

In order to protect the environment, be sure to pump down when relocating or disposing of the unit.

Wiring work

1. Electric wiring
and the communication wire
2. Wiring method
3. Wiring method of outdoor unit:
Remove the cover of terminal box and clamp.
Power Line
Connect respectively the live wire, neutral wire, ground wire to the L/N on terminal block and grounding screw on metal sheet.
Communication Line between Indoor & Outdoor
E.g. Connect respectively the terminal 1/2/3/GND of Indoor B to the 1/2/3 on Terminal B and grounding screw on metal sheet of Outdoor.
Max. 5 indoor units for 5U outdoor and the rest outdoors follow the same logic.
Reinstall the clamp and cover of terminal box according to the Installation Manual, after the connection above-mentioned done
Note: Power cord and communication wire are provided by consumers themselves.
.
(More than 30m, choose H07RN-F4G 4.0mm²)

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

3u70s2sr2fa4u75s2sr2fa4u85s2sr2fa5u90s2ss2fa5u105s2ss2fa

Table des Matières