Navien NFB-175 Mode D'emploi page 57

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Indoor Boiler Installation Venting Examples
The following are some possible indoor venting options:
Two-Pipe Sidewall Venting
Interior View
Exterior View
Intake Air
Exhaust Gas
i n .
m ) m
0 0 m
1 2 " ( 3
Exhaust Gas
Intake Air
Non-Concentric Sidewall Venting - Air is drawn from a different
location that is at least 12 in (300 mm) away from the exhaust
termination. The exhaust termination can be located either on
the sidewall or roof. Try to minimize the length of the intake air
pipe when installing the vent.
* 12" (300mm) above the highest anticipated snow level, or as
required by local codes, whichever is greater
Concentric Sidewall Venting
Combustion Air
Vent
Concentric Vertical Venting
Vent
Combustion Air
Combustion Air
Maintain 12"
(300 mm)
Vent
min. clearance
above highest
1" (25 mm) min.
anticipated snow
level or grade,
whichever is
greater
Maintain 12" (300mm) min.
clearance above highest
anticipated snow level or
grade, whichever is greater
(maximum of 24" above roof)
Venting the Boiler
57

Publicité

Chapitres

Table des Matières
loading

Ce manuel est également adapté pour:

Nfb-200

Table des Matières