GUTMANN Palma 10/1001 I/W Mode D'emploi page 39

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 46
Ceiling - island mounting
1. (For exhaust air operation) Prepare
suitable exhaust air ducting in the wall /
ceiling.
2. Determine the operating side of the
hood on the side where the control pa-
nel is located
3. To achieve optimum extraction capacity,
determine the position of the cooker
hood centrally above the hob (use a
plumb bob to help) and mark the centre
of the tower on the ceiling.
4. Mark the position for the fixing holes
using the drilling template or according
to the dimensional drawing on page 10.
5. Drill four holes (Ø10mm) and insert
dowels.
6. Screw hanger bolts into the dowels until
they protrude by approx. 20mm, then
screw nuts onto the hanger bolts. For
standard towers with quick mounting
flange, screw nuts onto the hanger
bolts in the same way.
ASSEMBLY INSTRUCTIONS
7. Lead the exhaust air
hose
(exhaust
operation)
connection line down
from the ceiling. The
exhaust
air
should be about 10
cm longer than the
upper tower.
air
and
hose
EN
39

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Campo 05/0501 i/wSombra 68/6801 i/w

Table des Matières